A full bathroom renovation in Leeds costs from £5,500 for a standard refit up to £15,000+ for a luxury walk-in shower with underfloor heating. Here is what you get for each price bracket in 2026, and what actually drives the costs.
Budget tier: £2,500 to £4,500
- Like-for-like suite swap (bath, WC, basin, taps)
- Existing tiles kept
- No plaster or electrical work
- Standard mid-range suite from Screwfix or Wickes
- 3 to 5 days on site
Best for: freshening up a decent bathroom that just needs a new suite. Landlord refresh between tenants.
Standard refit: £5,500 to £7,500
- New suite (bath or shower, WC, basin, taps)
- Full retile floor and walls (up to 15m²)
- Chrome towel rail plumbed in
- New extractor fan wired in
- Basic decorating
- 7 to 10 days on site
Best for: most homeowner refits. Solid quality, sensible spec, will last 15+ years.
Premium refit: £8,500 to £12,000
- Walk-in shower with fixed screen and thermostatic mixer
- Wall-hung WC on concealed cistern frame
- Vanity unit with countertop basin
- Full retile with premium porcelain (up to 20m²)
- Underfloor electric heating mat
- Recessed LED downlighters
- Mirror with backlight and demister
- Full decorating
- 10 to 14 days on site
Best for: adding real value to the house. Serious upgrade you notice every day.
Luxury refit: £13,000 to £20,000+
- Layout change (moving WC, extending shower, knocking through)
- Structural work if walls come out
- Underfloor heating wet system (feeds off the boiler)
- Premium brand fittings (Villeroy & Boch, Hansgrohe, Duravit)
- Book-matched large-format porcelain
- Custom-made vanity
- Steam function in shower
- Smart controls
- 14 to 21 days on site
What drives the price
Suite spec
You can spend £400 on a decent bath and WC from Screwfix or £4,000 on premium Villeroy & Boch. Same install labour either way.
Tile choice and coverage
Ceramic wall tiles are £15/m². Premium porcelain floor is £40 to £70/m². Large-format (600x300 or 1200x600) adds another 20% to labour because of the handling.
Layout changes
Moving the WC or shower means new soil pipe routes. Adds £600 to £1,400 depending on how far the change goes.
Building fabric
If we open up walls and find rotten timber, damp, or old lead pipework, that is honestly-quoted-extra. We warn you upfront if we suspect it.
What is normally included
- Strip out and dispose of old suite and tiles
- Install new suite (supplied or your choice)
- Plumbing to existing feeds (no new mains runs)
- Electrics for lights, fan, shaver socket (Part P notified)
- Full retile floor and walls
- Silicone sealing and grouting
- Basic decorating (ceiling and non-tiled walls)
- Site tidy and rubbish removal
What is not normally included
- Structural work (usually needs a builder)
- Plaster skim on new plasterboard (charged separately)
- Feature lighting fittings you supply
- Bath screens with unusual specs